Reconstruction of the old Danube riverbed – Zmajevac Danube backwater
Sokol d.o.o., Vinkovci
CompletedConstructions
Reconstruction of the old Danube riverbed – Zmajevac Danube backwater

31 May 2026
Reconstruction of the old Danube riverbed – Zmajevac Danube backwater
Sokol d.o.o., Vinkovci
Reconstruction of the old Danube riverbed – Zmajevac Danube backwater
Additional project information
Contract value: €4,252,177.26 (excluding VAT)
Contractual deadline
01. 2. 2024. – 31. 5. 2026.